We have different types of Burning furnace for LPG Cylinder Recondition Equipment.
For small round sheet cutting from big sheet (material preparing for shell) (with mould): 2pcs/per punching, 8pcs/minute.
Press the round sheet into a shell with dies.
Blank holder force: 1000KN | Tensile force: 2000KN | Main motor power: 44KW | Maximum slider stroke: 700mm | The weight of the machine: 12tons
Reliable and easy to operate.
Motor power: 5.5KW | Air pressure: 0.6Mpa | Process time: 20s | Weight: 1.5tons
Motor power: 7KW | Air pressure: 0.6Mpa | Process time: 15s | Weight: 1.5Tons
Punch the hole on head of the cylinder.
Electric power: 5.5KW | Punching speed: 180pcs/hour | Weight: 1.5ton
Submerged arc welding technology for valve seat ring joints. Ensures uniform forming and weld penetration.
CO2 gas shield welding process for cylinder base girth. Ensures concentricity and uniform forming.
Motor power: 0.55KW | Welding speed: 15s/pcs | Thickness of steel sheet: 2-4mm
Assembles both halves of the cylinder together.
Air pressure: 0.5-0.7Mpa | Weight: 1.5ton
Welding speed: 120s/pcs | Thickness of steel sheet: 2-4mm | Weight: 1.5ton
Production speed: 75pcs/hour | Size available: 320*700-420*1250mm | Machine size: 125000*1390*1560mm
Specialized testing for cylinder pressure integrity.
Efficient drying process post-testing.
Working efficiency: 150-200pcs/hour | Total power: 35K | Weight: 16ton
Productivity: Max. 90 pcs/hour | Zinc wire consumption: 93 kgs/hour | Arc spraying technology.
Working efficiency: 180pcs/hour | Air pressure: 0.4~0.6Mpa | Tower power: 15KW
Printing size: 700*600mm | Production efficiency: 2pcs/min | Ink consumption: ≤2g/pc
Motor power: 2.2KW | Welding speed: 24rpm | Weight: 0.9ton
Air test pressure: 2.2Mpa | Holding time: 60s | Size available: 320*700-420*1250mm
1. 24 hours technical support by email, call, video.
2. Warranty for one year after 12 months of shipment.
3. Installation and commissioning engineer will provide technical support, on-site training for operation, troubleshooting, and maintenance. Free installation training for one week.
1. Production starts after receiving a 40% deposit.
2. Balance payment is required after inspection and before delivery.
❓ Frequently Asked Questions
What is the production capacity of this LPG cylinder line?
The production line has a capacity of approximately 5000 sets per year.
What is the standard delivery time?
Delivery is typically completed within 3 months.
Do you provide on-site installation and training?
Yes, we provide engineer installation, commissioning, and on-site personnel training for operation and maintenance.
What kind of warranty is offered?
We provide a one-year warranty starting 12 months after the shipment date.
What are the payment terms for ordering?
A 40% deposit is required to arrange production, and the balance must be paid after inspection and before delivery.
What certifications does the equipment have?
The production line and equipment are ISO certified.