12.5kg 15kg LPG Gas Cylinder Production Line

Customization: Available
Automation: Automation
Gurantee: Withon One Year

Product Description

📋 Basic Information
Model NO.
MWA
Service
Engineer Installation and Training
Packing
Export Standard Wood Packing
Delivery
Within in 3months
Transmission Type
Flexible
Automatic Production Line
Comprehensive
Certification
ISO
Flexible Production
Lean Production
Rhythm
Non Flow Production Line
Production Scope
Parts Production Line
Origin
China
Production Capacity
5000sets / Year
📦 Packaging & Delivery
Package Size
1.00cm * 1.00cm * 1.00cm
Package Gross Weight
1.000kg
⚙️ 12.5kg 15kg LPG Gas Cylinder Production Line

We have different types of Burning furnace for LPG Cylinder Recondition Equipment.

LPG Production Line 1
LPG Production Line 2
1
De-coil and punching machine
For small round sheet cutting from big sheet (material preparing for shell) (with mould): 2pcs/per punching, 8pcs/minute.
2
Power press drawing the head
Press the round sheet into a shell with dies.
Blank holder force: 1000KN | Tensile force: 2000KN | Main motor power: 44KW | Maximum slider stroke: 700mm | The weight of the machine: 12tons
3
Automatic trimming machine
Reliable and easy to operate.
Motor power: 5.5KW | Air pressure: 0.6Mpa | Process time: 20s | Weight: 1.5tons
4
End dish necking cleaning machine
Motor power: 7KW | Air pressure: 0.6Mpa | Process time: 15s | Weight: 1.5Tons
5
Hole punching machine
Punch the hole on head of the cylinder.
Electric power: 5.5KW | Punching speed: 180pcs/hour | Weight: 1.5ton
6
Valve Seat Welding Machine
Submerged arc welding technology for valve seat ring joints. Ensures uniform forming and weld penetration.
7
Handle welding machine
CO2 gas shield welding process for cylinder base girth. Ensures concentricity and uniform forming.
8
Bottom base welding machine
Motor power: 0.55KW | Welding speed: 15s/pcs | Thickness of steel sheet: 2-4mm
9
Assembling Machine
Assembles both halves of the cylinder together.
Air pressure: 0.5-0.7Mpa | Weight: 1.5ton
10
Auto circumferential welding machine
Welding speed: 120s/pcs | Thickness of steel sheet: 2-4mm | Weight: 1.5ton
11
Heat treatment
Production speed: 75pcs/hour | Size available: 320*700-420*1250mm | Machine size: 125000*1390*1560mm
12
Hydro Testing Machine
Specialized testing for cylinder pressure integrity.
13
Drying machine
Efficient drying process post-testing.
14
Shot Blasting Machine
Working efficiency: 150-200pcs/hour | Total power: 35K | Weight: 16ton
15
Zinc Metalizing Machine
Productivity: Max. 90 pcs/hour | Zinc wire consumption: 93 kgs/hour | Arc spraying technology.
16
Powder Coating Line
Working efficiency: 180pcs/hour | Air pressure: 0.4~0.6Mpa | Tower power: 15KW
17
Printing machine
Printing size: 700*600mm | Production efficiency: 2pcs/min | Ink consumption: ≤2g/pc
18
Valve mounting machine
Motor power: 2.2KW | Welding speed: 24rpm | Weight: 0.9ton
19
Air leakage testing machine
Air test pressure: 2.2Mpa | Holding time: 60s | Size available: 320*700-420*1250mm
Production Line Banner
🛠️ After-sale Service

1. 24 hours technical support by email, call, video.

2. Warranty for one year after 12 months of shipment.

3. Installation and commissioning engineer will provide technical support, on-site training for operation, troubleshooting, and maintenance. Free installation training for one week.

💳 Terms of Payment

1. Production starts after receiving a 40% deposit.

2. Balance payment is required after inspection and before delivery.

LPG Machine Detail 1
LPG Machine Detail 2
LPG Machine Detail 3
LPG Machine Detail 4
LPG Machine Detail 5
Frequently Asked Questions
What is the production capacity of this LPG cylinder line?
The production line has a capacity of approximately 5000 sets per year.
What is the standard delivery time?
Delivery is typically completed within 3 months.
Do you provide on-site installation and training?
Yes, we provide engineer installation, commissioning, and on-site personnel training for operation and maintenance.
What kind of warranty is offered?
We provide a one-year warranty starting 12 months after the shipment date.
What are the payment terms for ordering?
A 40% deposit is required to arrange production, and the balance must be paid after inspection and before delivery.
What certifications does the equipment have?
The production line and equipment are ISO certified.

Related Products